We’ve moved in although loads more to do, lots of people have joined in the building work inside, and special thanks to Kaspar for plumbing and solar thermal and to Akwele for all the painting. Hot baths and clean painted rooms make all the ongoing work enjoyable. A recent piece of work was the pergola for the solar panels, just ready now (at summer’s end) to be connected up. The timberwork also acts as gutter, with a triangular fillet and bitumen paint, although no down pipe yet.